Advantages of Abram Pre Engineered Building

Pre engineered steel buildings (PEB) are steel structures built over a structural concept of primary members, secondary members, roof & wall sheeting connected to each other and various other building components. These buidings can be provided with different structural and non structural additions such as skylights, wall lights, turbo vents, ridge ventilators, louvers, roof monitors, doors & windows, trusses, mezzanine floors, fascias, canopies, crane systems, insulation panels etc, based on the custoers requirements. All the steel buildings are custom designed to be lighter in weight and high in strength. Thus steel building designs have become more flexible, durable and adaptable over the last four decades which has made steel one of the preferred materials for building construction.

PEB Advantages

Speedy and time saving constructions

Smooth and hassle fre execution at site

Earthquake resistant design

Perfect for adaptation to rooftop solar plants

Ease of expansion & modification.

Cost saving

Energy efficient

Low maintenance

Why Abram

Property Abram Udyog Pvt. Ltd. Conventional Buildings


Structure Weight
Abram Udyog Pvt. Ltd Structuresi.ePre engineered buildings are on the average 30% lighter because of the efficient use of steel. Primary framing members are tapered built up section. With the large depths in areas of higher stress. Primary steel members are selected hot rolled “T” sections. Which are, in many segments of the members heavier than what is actually required by design? Members have constant cross section regardless of the varying magnitude of the local stresses along the member length.
Secondary members are light weight roll formed “Z”or “C” shaped members. Secondary members are selected from standard hot rolled sections which are much heavier.


Design
Quick and efficient: since Abram’s Structures are mainly formed by standard sections and connections design, time is significantly reduced. Basic design based on international design codes are used over and over. Each conventional steel structure is designed from scratch with fewer design aids available to the engineer.
Specialized computer analysis design programs optimize material required. Drafting is also computerized using standard details to minimize the use of project custom details. Substantial engineering and detailing work is required from the very basic is required by the consultant with fewer design aids.


Delivery
Average 6 to 8 weeks Average 20 to 26 weeks


Foundations
Simple design, easy to construct and light weight. Extensive, heavy foundation required.


Erection Simplicity
Since the connection of compounds is standard the learning curve of erection for each subsequent project is faster. The connections are normally complicated and differ from project to project resulting tin increasing the time for erection of the buildings.


Erection Cost and Time
Both costs and time of erection are accurately known based upon extensive experience with similar buildings. Typically, conventional steel buildings are 20% more expensive than PEB in most of the cases, the erection costs and time are not estimated accurately.
The erection process is faster and much easier with very less requirement for equipment. Erection process is slow and extensive field labour is required. Heavy equipment is also needed.


Seismic Resistance
The low weight flexible frames offer higher resistance to seismic forces. Rigid heavy frames do not perform well in seismic zones.


Cost of Construction
Price per square meter may be as low as by 30 % than the conventional building. Higher price per square meter.


Architecture
Outstanding architectural design can be achieved at low cost using standard architectural details and interfaces. Special architectural design and features must be developed for each project which often requires research and thus resulting in higher cost.


Future Expansion
Future expansion is very easy and simple. Future expansion is most tedious and more costly.